Login
About Us
Who we are
Our purpose
Our vision
What we do
Why choose us
Calculators
3-Phase Transformer
3-Phase Motor & 3-Phase Generator
3-Phase Power
Battery,Charger & UPS
LV Cables
LV Max. Demand
Equipment Replacement
Transformer
Motor
Diesel Generator
Batteries
UPS
Predictive Maintenance
Transformer
Motor & Generator
HV Cables
HV Switchboard & Other Equipment
Explanation of Tests
Hazardous Area
Equipment Selection
Ex i Calculation
MDP Calculation
Installation Requirements
HA Classification
Inspection Requirements
EEHA Cloud
Online Ex Dossier
Equipment Health (Coming Soon)
Local Support (Coming Soon)
Contact us
Contact us
Feedback
Sign up
Price & Plans
You need to login to access this predictive maintenance module
Login
Create an account
HV Cables
Online Activities
Offline Activities
Visual inspection of cable
Check for any signs of abnormality.
Check for any signs of partial discharge on cable connections.
Online testing and monitoring:
Check for partial discharge, if online partial discharge monitoring system is installed.
Perform thermography of cable connections, where accessible.Check for phase indication, if installed.
Insulation resistance (IR) and polarisation index (PI) test.
Very low frequency (VLF) test.
Offline partial discharge test.
Power factor (Tan Delta) test.
Contact resistance (Ductor) test of main connection points.
Check for earthing connections for continuity.
Any other additional inspections and tests as recommended by the manufacturer.