Login
About Us
Who we are
Our purpose
Our vision
What we do
Why choose us
Calculators
3-Phase Transformer
3-Phase Motor & 3-Phase Generator
3-Phase Power
Battery,Charger & UPS
LV Cables
LV Max. Demand
Equipment Replacement
Transformer
Motor
Diesel Generator
Batteries
UPS
Predictive Maintenance
Transformer
Motor & Generator
HV Cables
HV Switchboard & Other Equipment
Explanation of Tests
Hazardous Area
Equipment Selection
Ex i Calculation
MDP Calculation
Installation Requirements
HA Classification
Inspection Requirements
EEHA Cloud
Online Ex Dossier
Equipment Health (Coming Soon)
Local Support (Coming Soon)
Contact us
Contact us
Feedback
Sign up
Price & Plans
You need to login to access this predictive maintenance module
Login
Create an account
HV Switchboard
Online Activities
Offline Activities
Visual inspection of switchboard
Check for any signs of abnormality.
Online testing and monitoring
Check for partial discharge, if online partial discharge monitoring system is installed.
Perform thermography of cable connections, where accessible.Check for phase indication, if insta
Visual inspection of busbar and internal connection including general cleaning.
Insulation resistance (IR) and polarisation index (PI) test on busbar.
Contact resistance (Ductor) test of main connection points.
Any other additional inspections and tests as recommended by the manufacturer.
HV Circuit Breaker
Online Activities
Offline Activities
Visual inspection of circuit breaker
Check for any signs of abnormality such as unusual vibration or noise.
Check for CB counter, where accessible, ensuring it is within the allowable number of switching operations.
Online testing and monitoring
Perform thermography, if IR window is installed.
Visual inspection of all parts for any abnormality.
Insulation resistance (IR) and polarisation index (PI) test.
Static or dynamic resistance test.
Circuit breaker timing test.
Power factor (Tan Delta) test.
Contact resistance (Ductor) test of main connection points.
Circuit breaker trip and open checks.
Charging motor functional test.
Busbar shutter inspection, where it is safely accessible.
Any other additional inspections and tests as recommended by the manufacturer.
Protection Relay
Online Activities
Offline Activities
Visual inspection of protection relay
Check for any active alarms.
Secondary injection test.
Primary injection test.
Trip and close function checks.
Check for any loose wirings.
Replace back up battery, if applicable.
Any other additional inspections and tests as recommended by the manufacturer.
Air Circuit Breaker (ACB)
Online Activities
Offline Activities
Visual inspection of ACB trip unit
Check for any active alarms.
Check for any abnormality such as unusual noise or vibration.
Secondary injection test for trip unit.
Primary injection test for trip unit.
Static or dynamic resistance test of ACB.
ACB timing test.
Insulation resistance (IR) and polarisation index (PI) test.
Trip and close function checks.
Any other additional inspections and tests as recommended by the manufacturer
Current Transformer (CT)
Offline Activities
General visual inspection for any abnormality such as heat damage or discoloration.
CT ratio and phase error test.
CT winding resistance test.
CT excitation and magnetisation curve check.
CT Insulation resistance (IR) and polarisation index (PI) test.
CT circuit continuity checks.
Check for any loose wirings.
Any other additional inspections and tests as recommended by the manufacturer.
Voltage Transformer (VT)
Offline Activities
General visual inspection for any abnormality such as heat damage or discoloration.
VT ratio and phase error test.
VT winding resistance test.
VT Insulation resistance (IR) and polarisation index (PI) test.
VT circuit continuity checks.
Check for any loose wirings.
Any other additional inspections and tests as recommended by the manufacturer.