Motor

Online Activities
Offline Activities
  1. Visual inspection of motor
    1. Check for any signs of oil leaks or other abnormality.
    2. Check for any unusual noise from motor
  2. Visual inspection of motor feeder panel
    1. Check for any active alarms
    2. Check for phase indication, if installed.
  3. Online testing and monitoring
    1. Check for partial discharge, if online partial discharge monitoring system is installed.
    2. Check for windings and bearing temperature, if monitored online.
    3. Check for bearings vibration levels, if monitored online.
    4. Perform thermography of termination box, if IR window is installed.
    5. Perform current signature analysis (CSA), if required.
  1. Insulation resistance (IR) and polarisation index (PI) test.
  2. DC winding resistance test.
  3. Winding insulation power factor and power factor tip-up test.
  4. Stator surge test.
  5. Offline partial discharge test.
  6. Motor cooler pressure test
  7. Motor bearing insulation resistance test for insulated bearings.
  8. Contact resistance (Ductor) test of main connection points.
  9. Visual inspection of motor internal components where accessible, inspection camera may be used for detailed internal inspection.
  10. Check for earthing connections for continuity.
  11. Inspection of all seals and gasket to ensure their integrity.
  12. Any other additional inspections and tests as recommended by the manufacturer.

Generator

Online Activities
Offline Activities
  1. Visual inspection of generator:
    1. Check for any signs of oil leaks or other abnormality.
    2. Check for any unusual noise from generator.
  2. Visual inspection of generator panel
    1. Check for any active alarms.
    2. Check for phase indication, if installed.
  3. Online testing and monitoring
    1. Check for partial discharge, if online partial discharge monitoring system is installed
    2. Check for windings and bearing temperature, if monitored online.
    3. Check for bearings vibration levels, if monitored online.
    4. Perform thermography of termination box, if IR window is installed.
  1. Insulation resistance (IR) and polarisation index (PI) test.
  2. Stator DC winding resistance test.
  3. Rotor AC and DC impedance test.
  4. Winding insulation power factor and power factor tip-up test.
  5. Offline partial discharge test.
  6. Generator cooler pressure test.
  7. Generator bearing insulation resistance test for insulated bearings.
  8. Contact resistance (Ductor) test of main connection points.
  9. Visual inspection of generator internal components where accessible, inspection camera may be used for detailed internal inspection.
  10. Check for earthing connections for continuity
  11. Inspection of all seals and gasket to ensure their integrity.
  12. Any other additional inspections and tests as recommended by the manufacturer.