Login
About Us
Who we are
Our purpose
Our vision
What we do
Why choose us
Calculators
3-Phase Transformer
3-Phase Motor & 3-Phase Generator
3-Phase Power
Battery,Charger & UPS
LV Cables
LV Max. Demand
Equipment Replacement
Transformer
Motor
Diesel Generator
Batteries
UPS
Predictive Maintenance
Transformer
Motor & Generator
HV Cables
HV Switchboard & Other Equipment
Explanation of Tests
Hazardous Area
Equipment Selection
Ex i Calculation
MDP Calculation
Installation Requirements
HA Classification
Inspection Requirements
EEHA Cloud
Online Ex Dossier
Equipment Health (Coming Soon)
Local Support (Coming Soon)
Contact us
Contact us
Feedback
Sign up
Price & Plans
You need to login to access this predictive maintenance module
Login
Create an account
Motor
Online Activities
Offline Activities
Visual inspection of motor
Check for any signs of oil leaks or other abnormality.
Check for any unusual noise from motor
Visual inspection of motor feeder panel
Check for any active alarms
Check for phase indication, if installed.
Online testing and monitoring
Check for partial discharge, if online partial discharge monitoring system is installed.
Check for windings and bearing temperature, if monitored online.
Check for bearings vibration levels, if monitored online.
Perform thermography of termination box, if IR window is installed.
Perform current signature analysis (CSA), if required.
Insulation resistance (IR) and polarisation index (PI) test.
DC winding resistance test.
Winding insulation power factor and power factor tip-up test.
Stator surge test.
Offline partial discharge test.
Motor cooler pressure test
Motor bearing insulation resistance test for insulated bearings.
Contact resistance (Ductor) test of main connection points.
Visual inspection of motor internal components where accessible, inspection camera may be used for detailed internal inspection.
Check for earthing connections for continuity.
Inspection of all seals and gasket to ensure their integrity.
Any other additional inspections and tests as recommended by the manufacturer.
Generator
Online Activities
Offline Activities
Visual inspection of generator:
Check for any signs of oil leaks or other abnormality.
Check for any unusual noise from generator.
Visual inspection of generator panel
Check for any active alarms.
Check for phase indication, if installed.
Online testing and monitoring
Check for partial discharge, if online partial discharge monitoring system is installed
Check for windings and bearing temperature, if monitored online.
Check for bearings vibration levels, if monitored online.
Perform thermography of termination box, if IR window is installed.
Insulation resistance (IR) and polarisation index (PI) test.
Stator DC winding resistance test.
Rotor AC and DC impedance test.
Winding insulation power factor and power factor tip-up test.
Offline partial discharge test.
Generator cooler pressure test.
Generator bearing insulation resistance test for insulated bearings.
Contact resistance (Ductor) test of main connection points.
Visual inspection of generator internal components where accessible, inspection camera may be used for detailed internal inspection.
Check for earthing connections for continuity
Inspection of all seals and gasket to ensure their integrity.
Any other additional inspections and tests as recommended by the manufacturer.